Search wiki using Sphinx

From The Space Library

Jump to: navigation, search

Displaying 11—20 of 1000 matches for query "KSC" retrieved in 0.001 sec with these stats:

  • "ksc" found 1916 times in 1132 documents



... had appointed Bridges to lead NASA's Langley Research Center LaRC . Kennedy had served as KSC's Deputy Director since November 2002 and, before that, he had served as Deputy Director ... . He had managed MARSHALL SPACE FLIGHT CENTER MSFC 's Space Shuttle Projects Resident Office at KSC in 1996, returning to MARSHALL SPACE FLIGHT CENTER MSFC later that year to manage the ... and development capability in space research and technology. (NASA, “James W. Kennedy Named Director, NASA KSC,” news release 03-217, 26 June 2003, http://www.nasa.gov/home/hqnews/2003/jun ...
... and launch of the Orbiter Discovery . Spaceflight Experience NASA EXPERIENCE: He was hired by NASA KSC in 1991 as a cryogenics and propulsion systems expert for the safety and mission assurance ... ; Rockwell International Corp. Certificate of Commendation; Group Achievement Awards (9); KSC Center Director Round Table Award; KSC Superior Performance Awards (2); KSC Public Affairs Certificate of Appreciation for Service. University of Central Florida ...
... V 3rd stage was flown from McDonnell Douglas ' Sacramento, Calif., plant to Kennedy Space Center KSC via Super Guppy aircraft. Other stages for third Apollo/ Saturn V mission had been transported to Kennedy Space Center KSC by barge. Boeing -built 1st stage, aboard NASA barge Poseidon , and NAR-built 2nd stage ...
... MSFC Release 76-128) MARSHALL SPACE FLIGHT CENTER MSFC announced completion of tests conducted with KSC to determine the effects of salty and brackish water on materials used in elements of ... study, the refurbished test bed would be used again for tests in the ocean by KSC personnel. ( MARSHALL SPACE FLIGHT CENTER MSFC Release 76-131) MARSHALL SPACE FLIGHT CENTER MSFC announced ... the Redstone airfield in 1978 atop a modified Boeing 747 and be off-loaded by KSC personnel. On the ground, the orbiter would become the responsibility of MARSHALL SPACE FLIGHT CENTER ...
... have a good 28-day mission." May 25: Skylab 2 (SL-2) was launched from KSC Launch Complex 39 , Pad B, on a two-stage Saturn IB launch vehicle into heavy ... recognized Seattle, Wash., and Conrad spotted both launch pads used for the Skylab launches at KSC. Conrad and Weitz popped open the shiny aluminum and orange canopy at 8:30 pm ... , and most experiments and was responsible for the Saturn IB and Saturn V launch vehicles. KSC managed launch operations. JSC was responsible for flight operations, recovery, crew selection and training, and ...
... °W and INTELSAT IV A F--2 at 29.5°W. (NASA Release 77-99; KSC Release 103-77; MORE-491-633-77-03 prelaunch May 20/77, postlaunch Aug 30 ... the first flights of the orbiter linked to its 747 carrier. (DFRC Release 18-77) KSC announced it had awarded to Planning Research Corporation, McLean, Va., a $25 720 364 contract ... services to the Space Shuttle program and other activities where the design-engineering directorate at KSC had design responsibilities. The 12mo cost-plus-award-fee extension through May 1978 had brought ...
... been arranged for minimum interference with the indigenous wildlife. Aerial surveys over KENNEDY SPACE CENTER KSC furnished information about group migratory habits, feeding grounds, and times for scheduling work in areas ... proved to be better at retrieving booster parachutes without tangling the lines. ( KENNEDY SPACE CENTER KSC Release 95-80) NASA said MARSHALL SPACE FLIGHT CENTER MSFC 's Spacelab program office had ...
... a field hearing in Florida to assess the impact on NASA’s Kennedy Space Center KSC workforce of the transition from the Space Shuttle Program (SSP) to the Constellation Program . Early ... offset some of those job losses. Altogether, he estimated that NASA’s Kennedy Space Center KSC would only lose 3,000-4,000 workers. As it shifted its workforce duties from other space centers to NASA’s Kennedy Space Center KSC , NASA would also create some new jobs. For instance, although the sustaining engineering for the ...
... hours of training and briefings were crammed into their work days at both MSC and KSC. Some required all three astronauts’ presence, others called for the CSM pilot alone, or just ... building, the “back lot” at MSC, a small, outdoor site at the Kennedy Space Center KSC , and the special analog sites at different locations scattered around the country chosen to be ... could support. However, there was an indoor site that did include a LM simulator. The KSC simulations were often conducted in pressure suits to provide as much authenticity as possible. Equipment ...
... the big problems was, there were two different centers. There was the Kennedy Space Center KSC . They always wanted to test stuff again after it’s been already accepted . It shouldn ... us the best chance . So I came down here and had a session with the KSC people and the center director… and I said, "Now, you need to provide lightning protection ... know, and on and on and all this stuff like what was normally done at KSC . Special buildings, making them, didn't have them there. Everything was just, whatever you needed ...

Additional database time was 0.074 sec.


Result page: 1  2  3  4  5  6  7  8  9  10  Next 
 
Search in namespaces:

















Powered by Sphinx
Views