Search wiki using Sphinx

From The Space Library

Jump to: navigation, search

Displaying 71—80 of 1000 matches for query "Plum_Brook_Facility" retrieved in 0.002 sec with these stats:

  • "plum" found 95 times in 70 documents
  • "brook" found 377 times in 217 documents
  • "facil" found 5278 times in 2950 documents



... difficulties in Atlas booster's guidance system. ''(Hines, Wash. Sun. Star, 4/21/63)'' ASA Plum Brook Research Reactor , Sandusky, Ohio, reached full power for the first time. 60.000 kilowatts of ...
... , 8/3/63, 9)'' Atlas booster, first stage of Centaur space launch vehicle, arrived at Plum Brook Station to begin series of structural tests in E-Stand. ''(LRC Release 63-64, Lewis ...
... Achievement Award presented to Centaur "E" Stand Project personnel at NASA Lewis Research Center 's Plum Brook Station for their significant contributions resulting in the successful completion of re-search testing of ...
... . Louis GBD, 12/8/69)'' Lewis Research Center LeRC 's 60-mw test reactor at Plum Brook Station, Ohio, completed 100th cycle of operation. It had begun full-power operation in April ...
... in air, coal and other fuel samples, and corn damaged by birds LeRC scientists at Plum Brook Station, Ohio, were making analyses for Lewis Research Center LeRC Environmental Research Office to identify ...
... -G. Work on nuclear propulsion would be dis­continued and work on nuclear power curtailed. Plum Brook Station of Lewis Research Center would be closed. In aeronautics, quiet, propulsive­ lift, experimental, short ...
... . The $200 000 NSF windmill would be built by NASA at Lewis Research Center 's Plum Brook Station to capture the maximum possible power from the wind with the minimum construction costs ...
... April 74; Tass, FBIS-Sov, 25 April 74, Ul ; SF, Sept 74, 395)'' NASA's Plum Brook Station had tested an experimental hypersonic ramjet engine in a hypersonic wind tunnel with simulated ...
... 37 m in dia, already under design and construction, Would be erected at LeRC 's Plum Brook test area. ''( LeRC Release 74-73)'' October 1974 October November 1974 November Nov 1 1974 ...
... long as the 19m blades powering the 100kw generator at Lewis Research Center LeRC 's Plum Brook Station in Sandusky, O. The $2-million contract would cover design, fabrication, and test and ...

Additional database time was 0.038 sec.


Result page: Previous  4  5  6  7  8  9  10  11  12  13  Next 
 
Search in namespaces:

















Powered by Sphinx
Views