Search wiki using Sphinx

From The Space Library

Jump to: navigation, search

Displaying 81—90 of 1000 matches for query "Jul_9_1978" retrieved in 0.006 sec with these stats:

  • "jul" found 39334 times in 1829 documents
  • "9" found 37303 times in 13928 documents
  • "1978" found 10299 times in 813 documents



... and NASA signed a contract for launch of three Japanese geosynchronous satellites in 1977 and 1978. NASA would launch the satellites on a Delta launch vehicle on a cost-reimbursable basis ... 7 Jul 8 1975 8 Jul 9 1975 9 Jul 10 1975 10 Jul 11 1975 11 Jul 12 1975 12 Jul 13 1975 13 Jul 14 1975 14 Jul 15 1975 15 Jul 16 1975 16 Jul 17 1975 17 Jul 18 1975 18 Jul 19 ...
... restored $48.4 million for the two-spacecraft Pioneer- Venus mission scheduled for launch in 1978; the House had cut the funds requested by NASA in the original budget. The Senate ... 7 Jul 8 1975 8 Jul 9 1975 9 Jul 10 1975 10 Jul 11 1975 11 Jul 12 1975 12 Jul 13 1975 13 Jul 14 1975 14 Jul 15 1975 15 Jul 16 1975 16 Jul 17 1975 17 Jul 18 1975 18 Jul 19 ...
... be accepted through June 1977, and candidates would report to Johnson Space Center in July 1978 for 2 yr of training. Appointment as an astronaut would depend on satisfactory completion of ... 8 Jul 9 1976 9 Jul 10 1976 10 Jul 11 1976 11 Jul 12 1976 12 Jul 13 1976 13 Jul 14 1976 14 Jul 15 1976 15 Jul 16 1976 16 Jul 17 1976 17 Jul 18 1976 18 Jul 19 ...
... that went to Kamchatka, then proceed to Kamchatka about 3740 km away. In 1977 and 1978, the expedition would cruise to the Bering Strait and go ashore in North America where ... 7 Jul 8 1976 8 Jul 9 1976 9 Jul 10 1976 10 Jul 11 1976 11 Jul 12 1976 12 Jul 13 1976 13 Jul 14 1976 14 Jul 15 1976 15 Jul 16 1976 16 Jul 17 1976 17 Jul 18 1976 18 Jul 19 ...
... propulsion systems, with an option for 2 additional systems. The contract would run through August 1978. The engines would be used to launch high-energy astronomical observatories (HEAD), or commercial ... 8 Jul 9 1976 9 Jul 10 1976 10 Jul 11 1976 11 Jul 12 1976 12 Jul 13 1976 13 Jul 14 1976 14 Jul 15 1976 15 Jul 16 1976 16 Jul 17 1976 17 Jul 18 1976 18 Jul ...
... negotiating with NASA and ERDA a $7-million contract to design, build, and test by 1978 a 1.5-Mw wind-turbine electricity-generating system, biggest in history. The experimental system ... 7 Jul 8 1976 8 Jul 9 1976 9 Jul 10 1976 10 Jul 11 1976 11 Jul 12 1976 12 Jul 13 1976 13 Jul 14 1976 14 Jul 15 1976 15 Jul 16 1976 16 Jul 17 1976 17 Jul 18 1976 18 Jul 19 ...
... as Space Shuttle astronauts after a yr-long recruiting effort. Candidates selected would report in 1978 for a 2yr training period at Johnson Space Center . Of the 8037 applicants, 6735 were ... 8 Jul 9 1977 9 Jul 10 1977 10 Jul 11 1977 11 Jul 12 1977 12 Jul 13 1977 13 Jul 14 1977 14 Jul 15 1977 15 Jul 16 1977 16 Jul 17 1977 17 Jul 18 1977 18 Jul 19 ...
... of the two categories in December. Candidates would report to Johnson Space Center JSC in 1978 for 2yr of training and evaluation; final selection as astronaut would depend on satisfactory ... 8 Jul 9 1977 9 Jul 10 1977 10 Jul 11 1977 11 Jul 12 1977 12 Jul 13 1977 13 Jul 14 1977 14 Jul 15 1977 15 Jul 16 1977 16 Jul 17 1977 17 Jul 18 1977 18 Jul 19 ...
... the NASA Advisory Committee. He had directed MIT's gas-turbine laboratory from 1968 to 1978. He received his Ph.D. from CalTech in 1956; from 1951 to 1953 he was ... 7 Jul 8 1981 8 Jul 9 1981 9 Jul 10 1981 10 Jul 11 1981 11 Jul 12 1981 12 Jul 13 1981 13 Jul 14 1981 14 Jul 15 1981 15 Jul 16 1981 16 Jul 17 1981 17 Jul 18 1981 18 Jul 19 ...
... in 1991. A TOMS instrument had monitored ozone concentrations from a Nimbus-7 satellite since 1978, focusing on the southern hemisphere and the development of the Antarctic ozone hole. This ... 8 Jul 9 1990 9 Jul 10 1990 10 Jul 11 1990 11 Jul 12 1990 12 Jul 13 1990 13 Jul 14 1990 14 Jul 15 1990 15 Jul 16 1990 16 Jul 17 1990 17 Jul 18 1990 18 Jul 19 ...

Additional database time was 0.038 sec.


Result page: Previous  4  5  6  7  8  9  10  11  12  13  Next 
 
Search in namespaces:

















Powered by Sphinx
Views