Search wiki using Sphinx

From The Space Library

Jump to: navigation, search

Displaying 31—40 of 79 matches for query "3.235.2.16" retrieved in 0.002 sec with these stats:

  • "3" found 42922 times in 14882 documents
  • "235" found 142 times in 131 documents
  • "2" found 46648 times in 15524 documents
  • "16" found 34109 times in 13481 documents

Above numbers may include documents not listed due to search options.


... ; KSC Releases 268-72, 270-72)'' Soil sample collected by Apollo 16 Astronaut Charles M. Duke , Jr., from natural hole beneath 3-m (10-ft) -high "Shadow Rock" on moon had been ... Explorer 47 in circular orbit with 235 639-km (146 419.3-mi) apogee, 201 599-km (125 267.8-mi) perigee, 12.3-day period, and 17.2° inclination. By Sept. 25, 10 ... 1972 12 Sep 13 1972 13 Sep 14 1972 14 Sep 15 1972 15 Sep 16 1972 16 Sep 17 1972 17 Sep 18 1972 18 Sep 19 1972 19 Sep 20 ...
... station and conducted scientific experiments for 24 days before their reentry tragedy. Salyut 2 was launched into orbit 3 April 1973, but an explosion or wildly firing thrusters sent the station out ... Dec 74-13 Feb 75; SF, June 75, 235; April 75, 144-5; O'Toole, IV Post, 31 Dec 74, A7; UPI, NYT, 16 Jan 75, 14; SBD, 14 Jan 75, 62; LC, S&T News Alert 2645)'' November 1974 November December 1974 December Dec 1 1974 1 Dec 2 1974 2 Dec 3 1974 3 Dec ...
... two atomic reactors for production of plutonium; reduce production of uranium-235 in the next several years; and allocate more fissionable materials for ... , 21)'' April 1964 April Apr 1 1964 1 Apr 2 1964 2 Apr 3 1964 3 Apr 4 1964 4 Apr 5 1964 5 Apr 6 1964 ... 13 1964 13 Apr 14 1964 14 Apr 15 1964 15 Apr 16 1964 16 Apr 17 1964 17 Apr 18 1964 18 Apr 19 ...
... -km. (252-mi.) perigee, 2-hr., 48 min. period, and 60.86¦ inclination to the equator. ELECTRON IV was orbiting at 66,235-km. (41,158-mi.) ... 7/11/64,15)'' July 1964 July Jul 1 1964 1 Jul 2 1964 2 Jul 3 1964 3 Jul 4 1964 4 Jul 5 1964 5 Jul 6 1964 ... Jul 13 1964 13 Jul 14 1964 14 Jul 15 1964 15 Jul 16 1964 16 Jul 17 1964 17 Jul 18 1964 18 Jul 19 1964 19 ...
... X-15 No. 2 was flown by pilot John B. McKay (NASA) to 92,600-ft. altitude at a maximum speed of 3,260 mph (mach 4,80) to obtain data on ... uranium 235-one of the technically most difficult ways to produce the nuclear bomb. ''(AP, NYT, 4/30/65, 3)'' April 1965 April Apr 1 1965 1 Apr 2 1965 2 Apr 3 1965 3 Apr ... 1965 12 Apr 13 1965 13 Apr 14 1965 14 Apr 15 1965 15 Apr 16 1965 16 Apr 17 1965 17 Apr 18 1965 18 Apr 19 1965 19 Apr 20 ...
... was now capable of supporting fully operational Surveyor missions. ''(NASA Release 65-235; KSC Spaceport News, 8/12/65, 1; AP, NYT, 8/12/65, ... G-22-65)'' August 1965 August Aug 1 1965 1 Aug 2 1965 2 Aug 3 1965 3 Aug 4 1965 4 Aug 5 1965 5 Aug 6 ... 13 1965 13 Aug 14 1965 14 Aug 15 1965 15 Aug 16 1965 16 Aug 17 1965 17 Aug 18 1965 18 Aug 19 1965 ...
... )'' October 31: SST design proposal evaluations were submitted to FAA by 235-member Government team and 30 domestic and foreign airlines; FAA Administrator ... 66-95)'' October 1966 October Oct 1 1966 1 Oct 2 1966 2 Oct 3 1966 3 Oct 4 1966 4 Oct 5 1966 5 Oct ... 1966 13 Oct 14 1966 14 Oct 15 1966 15 Oct 16 1966 16 Oct 17 1966 17 Oct 18 1966 18 Oct 19 ...
... instruments functioned satisfactorily. Nike-Tomahawk carried Univ. of Colorado payload to 235-km (146.0-mi) altitude to measure Vegard-Kaplan and ... measurements of Mars. ''(P Inq, 3/25/70)'' March 1970 March Mar 1 1970 1 Mar 2 1970 2 Mar 3 1970 3 Mar 4 1970 4 ... 1970 13 Mar 14 1970 14 Mar 15 1970 15 Mar 16 1970 16 Mar 17 1970 17 Mar 18 1970 18 Mar 19 ...
... , 7/27/70, 7)'' NASA published Apollo 12 Preliminary Science Report (NASA SP-235): Nov. 14-24, 1969, mission had accomplished "wide variety of preplanned ... 1970 June July 1970 July Jul 1 1970 1 Jul 2 1970 2 Jul 3 1970 3 Jul 4 1970 4 Jul 5 1970 5 Jul 6 ... 13 1970 13 Jul 14 1970 14 Jul 15 1970 15 Jul 16 1970 16 Jul 17 1970 17 Jul 18 1970 18 Jul 19 ...
... review was to "recommend operational refinements or aircraft modifications where necessary." ''(WSJ, 11/30/71, 3)'' DOD signed $25-million contract with Lockheed Space & Missiles Corp. for definition and development phase ... Lefevre, ESC Chairman. ''(NASA Release 71-235, 71-241; NASA PAO)'' October 1971 October November 1971 November Nov 1 1971 1 Nov 2 1971 2 Nov 3 1971 3 Nov 4 1971 4 Nov 5 ... 1971 12 Nov 13 1971 13 Nov 14 1971 14 Nov 15 1971 15 Nov 16 1971 16 Nov 17 1971 17 Nov 18 1971 18 Nov 19 1971 19 Nov 20 ...

Additional database time was 0.039 sec.


Result page: Previous  2  3  4  5  6  7  8 
 
Search in namespaces:

















Powered by Sphinx
Views