Search wiki using Sphinx

From The Space Library

Jump to: navigation, search

Displaying 91—100 of 757 matches for query "Apollo_12_MET_145.32-146.00_Rendezvous_and_docking_VOA_Coverage" retrieved in 0.005 sec with these stats:

  • "apollo" found 21018 times in 7790 documents
  • "12" found 38851 times in 14387 documents
  • "met" found 1179 times in 839 documents
  • "145" found 218 times in 202 documents
  • "32" found 2193 times in 1165 documents
  • "146" found 234 times in 193 documents
  • "00" found 511 times in 388 documents
  • "rendezv" found 1700 times in 914 documents
  • "and" found 284902 times in 19361 documents
  • "dock" found 2392 times in 1146 documents
  • "voa" found 462 times in 351 documents
  • "coverag" found 1581 times in 906 documents

Above numbers may include documents not listed due to search options.


... the Harmony module for its stay at the space station. Live coverage of the rendezvous and capture will begin at 5:30 a.m. on NASA TV, ... the Vietnam War were growing, gas was priced at 32 cents per gallon, (You're My) Soul and Inspiration was the No. 1 song on the ... of America's space program. In all those years, through both the Apollo and Space Shuttle Programs, no mission ever failed as a result of a ...
... coverage of the docking will begin at 4:15 p.m. Hatches between the Soyuz and station will open at approximately 7:35 p.m., and ... which will help improve hurricane intensity, track, and storm surge forecasts, on Dec. 12 from Cape Canaveral Air Force Station in Florida ... capturing four wind measurements per second, adding as much as 32 wind measurements per second for the entire constellation. CYGNSS ...
... Apollo Applications ( Apollo Applications AA ) program, was named Apollo Mission Director and Apollo Program Deputy Director for Missions, OMSF. Schneider would be responsible for management, direction, and coordination of mission and flight plans, schedules, and ...
... and House met in Joint Session to receive and pay tribute to Apollo 15 astronauts, who reported on mission. Mission commander David R. Scott said of Apollo ... and Lockheed Missiles & Space Co. Films from Apollo 15 LRV Rover on moon were shown. Soviet scientist Vladimir S. Syromyatnikov and MSC engineer James C. Jones presented papers on space vehicle docking ... 12 1971 12 ...
... Apollo 12 astronauts, to determine why original white paint had discolored, Boeing Co. said. White paint reflected intense solar rays in space and ... coverage needed, except for the four synchronous satellites. Promising signs of significant contributions towards these have come from other countries." ''(A&A, 10/70, 28-32 ...
... 16 of the station's 32 control jets unusable, and less than 1,000 pounds of ... tug to one of the docking ports, however, and use its control jets to maneuver ... rendezvous with Salyut 7 , claiming that the cosmonauts there were "living normally." Lyakhov and Aleksandrov appeared on Moscow television October 16 and ... 10 1983 10 Oct 11 1983 11 Oct 12 1983 12 Oct 13 1983 13 Oct 14 1983 ...
... and Analysis Center at Caltech. Caltech manages JPL for NASA. ''RELEASE: 12 ... and NASA Television will provide live coverage of launch and docking. This week, NASA Flight Engineer Joseph Acaba and his two Russian crewmates, Soyuz Commander Gennady Padalka and ...
... and transmit data in the visible, thermal and water vapor parts of the spectrum; they observe cloud top temperatures, sea surface temperature, and winds. The coverage ... orbital planes inclined at 55 degrees. These are in a 12-hour circular orbit at 20,200 km altitude. There ... technique like the older Transit and COSPAS-SARSAT systems. Each transmitter can have up to 32 sensors and can transmit 15 kb ...
... rendezvous; pre-parking of unmanned freight, shielding, and modules; unlimited rendezvous and liftoff windows; continuous line-of-sight communications between earth, rendezvous craft, and ...
... -trol tower operator cleared the Convair to land on Runway 32 Left. The Convair pilot acknowledged the new runway assignment ... success. It had met prelaunch objectives of making detailed and continuous studies of the interplanetary environment and studying particle and field interactions in ... 9 May 10 1973 10 May 11 1973 11 May 12 1973 12 May 13 1973 13 May 14 1973 14 ...

Additional database time was 0.093 sec.


Result page: Previous  5  6  7  8  9  10  11  12  13  14  Next 
 
Search in namespaces:

















Powered by Sphinx
Views