Feb 22 1968

From The Space Library

Revision as of 13:33, 29 September 2009 by RobertG (Talk | contribs)
(diff) ←Older revision | Current revision (diff) | Newer revision→ (diff)
Jump to: navigation, search

SST prototype construction would be delayed one year because of design changes "which would result in significant improvements in the production airplane," Boeing Co. President William M. Allen an­nounced. Detailed plans of recommended changes were being prepared for FAA approval. Although present design could result in airworthy flight-test aircraft, FAA and airline reviewers had concluded that proto­type should have more substantial range and payload "to assure it is a sound foundation for an economically successful commercial aircraft." First flights now would be in 1972. (Boeing Release; W Post, 2/23/68, A3; WSJ, 2/23/68, 4)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29