Dec 13 2012

From The Space Library

Jump to: navigation, search

RELEASE: 12-433 NASA NAMED BEST PLACE TO WORK IN GOVERNMENT -- WORK FORCE RALLIES TO SUPPORT NEW DIRECTION IN POST-SHUTTLE ERA

WASHINGTON -- NASA was named the best place to work in the federal government among large agencies in a survey released today by the Partnership for Public Service, a nonprofit, non-partisan organization. This ranking, which reflects NASA's highest results since this index was developed, makes clear that the agency's work force is focused on carrying out the nation's new and ambitious space program. "The best workforce in the nation has made NASA the best place to work in federal government," said NASA Deputy Administrator Lori Garver, who is accepting the award at a ceremony this morning in Washington, D.C. "Our employees are carrying out the nation's new strategic missions in space with heart-stopping landings on Mars, cutting-edge science and ground-breaking partnerships with American companies to resupplying the space station. They are truly leading in the innovation economy." The rankings are based on responses from nearly 700,000 federal workers. The Best Places to Work rankings are based on data from the Office of Personnel Management's annual Federal Employee Viewpoint Survey conducted from April through June 2012 and additional survey data from nine agencies plus the Intelligence Community. This is the seventh edition of the Best Places to Work rankings since the first in 2003. NASA's Stennis Space Center was ranked second in the sub-agency component category. During the past year, NASA's employees continued to implement America's ambitious space exploration program, landing the most sophisticated rover on the surface of Mars, carrying out the first-ever commercial mission to the International Space Station and advancing the systems needed to send humans deeper into space. Just last week, NASA announced the next Mars rover mission and recently announced the first year-long crew stay on the International Space Station. As the agency continues developing the capabilities to explore the solar system and beyond, as well as understand our home planet and make life better here, workers with a wide range of skills and interests will be critical.

RELEASE: 12-434 TWIN NASA PROBES PREPARE FOR DEC. 17 MISSION-ENDING MOON IMPACT

PASADENA, Calif. -- Twin lunar-orbiting NASA spacecraft that have allowed scientists to learn more about the internal structure and composition of the moon are being prepared for their controlled descent and impact on a mountain near the moon's north pole at about 2:28 p.m. PST (5:28 p.m. EST) Monday, Dec. 17. Ebb and Flow, the Gravity Recovery and Interior Laboratory (GRAIL) mission probes, are being sent purposely into the lunar surface because their low orbit and low fuel levels preclude further scientific operations. The duo's successful prime and extended science missions generated the highest resolution gravity field map of any celestial body. The map will provide a better understanding of how Earth and other rocky planets in the solar system formed and evolved. "It is going to be difficult to say goodbye," said GRAIL principal investigator Maria Zuber of the Massachusetts Institute of Technology in Cambridge. "Our little robotic twins have been exemplary members of the GRAIL family, and planetary science has advanced in a major way because of their contributions." The mountain where the two spacecraft will make contact is located near a crater named Goldschmidt. Both spacecraft have been flying in formation around the moon since Jan. 1, 2012. They were named by elementary school students in Bozeman, Mont., who won a contest. The first probe to reach the moon, Ebb, also will be the first to go down, at 2:28:40 p.m. Flow will follow Ebb about 20 seconds later. Both spacecraft will hit the surface at 3,760 mph (1.7 kilometers per second). No imagery of the impact is expected because the region will be in shadow at the time. Ebb and Flow will conduct one final experiment before their mission ends. They will fire their main engines until their propellant tanks are empty to determine precisely the amount of fuel remaining in their tanks. This will help NASA engineers validate fuel consumption computer models to improve predictions of fuel needs for future missions. "Our lunar twins may be in the twilight of their operational lives, but one thing is for sure, they are going down swinging," said GRAIL project manager David Lehman of NASA's Jet Propulsion Laboratory in Pasadena, Calif. "Even during the last half of their last orbit, we are going to do an engineering experiment that could help future missions operate more efficiently." Because the exact amount of fuel remaining aboard each spacecraft is unknown, mission navigators and engineers designed the depletion burn to allow the probes to descend gradually for several hours and skim the surface of the moon until the elevated terrain of the target mountain gets in their way. The burn that will change the spacecrafts' orbit and ensure the impact is scheduled to take place Friday morning. "Such a unique end-of-mission scenario requires extensive and detailed mission planning and navigation," said Lehman. "We've had our share of challenges during this mission and always come through in flying colors, but nobody I know around here has ever flown into a moon mountain before. It'll be a first for us, that's for sure." During their prime mission, from March through May, Ebb and Flow collected data while orbiting at an average altitude of 34 miles (55 kilometers). Their altitude was lowered to 14 miles (23 kilometers) for their extended mission, which began Aug. 30 and sometimes placed them within a few miles of the moon's tallest surface features. JPL manages the GRAIL mission for NASA's Science Mission Directorate in Washington. The mission is part of the Discovery Program managed at NASA's Marshall Space Flight Center in Huntsville, Ala. Lockheed Martin Space Systems in Denver built the spacecraft.

RELEASE: 12-435 NASA PROGRESSING TOWARD FIRST LAUNCH OF ORION SPACECRAFT

WASHINGTON -- Recent engineering advances by NASA and its industry partners across the country show important progress toward Exploration Flight Test-1 (EFT-1), the next step to launching humans to deep space. The uncrewed EFT-1 mission, launching from NASA's Kennedy Space Center in Florida in 2014, will test the re-entry performance of the agency's Orion capsule, the most advanced spacecraft ever designed, which will carry astronauts farther into space than ever before. "These recent milestones are laying the foundation for our first flight test of Orion in 2014," said Dan Dumbacher, deputy associate administrator for exploration systems development at NASA Headquarters in Washington. "The work being done to prepare for the flight test is really a nationwide effort and we have a dedicated team committed to our goal of expanding the frontier of space." A tool that will allow the titanium skeleton of the Orion heat shield to be bolted to its carbon fiber skin is at the Denver facility of the spacecraft's prime contractor Lockheed Martin. This will enable workers to begin assembling the two pieces of the heat shield. Almost 3,000 bolts are needed to hold the skeleton to the skin. A special stand was built to align the skin on the skeleton as holes for the bolts are drilled. Work to bolt the skeleton to the skin will be completed in January. The heat shield then will be shipped to Textron Defense Systems near Boston where the final layer, an ablative material very similar to that used on the Apollo spacecraft, will be added. The completed heat shield is scheduled to be ready for installation onto the Orion crew module at Kennedy next summer. To test the heat shield during EFT-1's re-entry, Orion will travel more than 3,600 miles above Earth's surface, 15 times farther than the International Space Station's orbital position. This is farther than any spacecraft designed to carry humans has gone in more than 40 years. Orion will return home at a speed almost 5,000 mph faster than any current human spacecraft. This week, engineers at NASA's Marshall Space Flight Center in Huntsville, Ala., received materials to begin manufacturing the adapter that will connect the Orion capsule to a United Launch Alliance Delta IV heavy-lift rocket for EFT-1. Two forward and two aft rings will be welded to barrel panels to form two adapters. This adapter design will be tested during EFT-1 for use during the first launch of NASA's next heavy-lift rocket, the Space Launch System (SLS), in 2017. SLS will launch NASA's Orion spacecraft and other payloads beyond low Earth orbit, providing an entirely new capability for human exploration. Data from the adapter on the flight test will provide Marshall engineers with invaluable experience developing hardware early in the design process. Designing the adapter once for multiple flights also provides a cost savings. Of the two adapters welded at Marshall, one will attach Orion to the Delta IV heavy-lift rocket used for EFT-1. The other adapter will be a structural test article to gain knowledge on the design. NASA's Ground Systems Development and Operations (GSDO) Program also has passed a major agency review that lays the groundwork at Kennedy to support future Orion and SLS launches. The GSDO Program completed a combined system requirements review and system definition review, in which an independent board of technical experts from across NASA evaluated the program's infrastructure specifications, budget and schedule. The board confirmed GSDO is ready to move from concept development to preliminary design. The combination of the two assessments represents a fundamentally different way of conducting NASA program reviews. The team is streamlining processes to provide the nation with a safe, affordable and sustainable launch facility. The GSDO program last week also led the third Stationary Recovery Test Working Group session in Norfolk, Va. The team presented to the U.S. Navy detachment that will recover the capsule during EFT-1 a complete list of tasks required to accomplish stationary recovery test objectives. The working group outlined the plan for roles and responsibilities to accomplish required test procedures. Included in these presentations were the commanding officer of the USS Mesa Verde and the fleet forces command director of operations, who both expressed complete support for the test.