Analysis conducted by the Office of Space Station in the areas of Space Station management, use of expendable launch vehicles, and cost impacts resulting from design changes was accepted by NASA. Changes included replacing the nodes and tunnels that connected pressurized modules with larger resource nodes, revising the assembly sequence to provide early scientific return and reduce extravehicular activity, achieving an initial power level of 37.5 kilowatts, achieving permanent human capability, and placing fixed servicing capabilities closer to the modules. Realignment of certain work package responsibilities was also recommended; the total cost increase would be around $49 million. (NASA Release 86-180; 86-181)