Jul 4 1988

From The Space Library

Jump to: navigation, search

The fully assembled Space Shuttle Discovery vehicle was rolled out of the Kennedy Space Center Vehicle Assembly Building (VAB) to Launch Pad 39-B in preparation for mission STS-26, scheduled for late September. (UPI, Jul 4/88; NY Times, Jul 5/88; W Post, Jul 5/88; WSJ, Jul 5/88; W Times, Jul 5/88; P Inq, Jul 5/88)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31