Nov 15 1977

From The Space Library

Jump to: navigation, search

JSC announced it had signed a supplemental agreement with Rockwell International Corp. for engineering-change orders on the Space Shuttle orbiter. The supplement, valued at about $226 million, would bring the value of the Rockwell contract to about $3.2 billion. The supplement would cover changes such as addition of lightning protection, payload and systems integration, avionics changes, provision of spares, and support of the carrier aircraft during ALT. (JSC Release 77-76)

JSC announced it had signed a contract modification with Ford Aerospace covering hardware and software systems engineering, plus maintenance and operation of JSC's mission control center and other ground-based data systems. The modification, valued at more than $1.4 million, would bring the value of the Ford contract to about $51.3 billion. (JSC Release 77-77)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30