Aug 1 1961

From The Space Library

Revision as of 02:54, 12 September 2009 by RobertG (Talk | contribs)
(diff) ←Older revision | Current revision (diff) | Newer revision→ (diff)
Jump to: navigation, search

NASA directed Marshall Space Flight Center to enter contract negotiations with contractors for procurement of five operational Atlas-Centaur vehicles. These launchings were planned to begin in second quarter of 1964.

NASA Ranger I launch from Atlantic Missile Range postponed at T minus 15 minutes because of failure of ground-support equipment.

NASA Apollo briefing held at Space Task Group for all prime contractors interested in submitting bids.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31